Pilot Punch similar DIN ISO 8020 Type C Long Lead Style Punches
ms mold parts
minimum order
1 piece
Country of Origin
ShenZhen GuangZhou
Quantity:
$0.10 - $9.00 / piece
- Place of Origin:Guangdong, China
- Brand Name:MS Mold Parts
- Model Number:ms mold parts
- Shaping Mode:Plastic Injection Mould
- Product Material:copper Suj2
- Product:Vehicle Mould
- Product Name:guide bushing
- Standard:JIS, AISI, ASTM, GB, DIN, EN, musimu
- Plated:TiN, TiCN
- Certification:ISO9001:2008
- Mould material:SUJ2, Brass
- Shipment:Fedex.DHL.UPS.TNT
- Delivery Time:7-8 working days
- Payment:T.T Western Union , Paypal
Product Description


Specification
Material | Carbide,ASP23,Vanadis,CPMRTXM4,SKD11,SKD61,HSS,A2,M2,D2,SUJ2,S45C,ect |
Standard | Dayton,Lane,DIN,ISO,MISUMI,EDM,FIBRO,MOELLER,HASCO,ect |
Size | Depend on your drawings or products standard |
Place of origin | Dongguan, Guangdong, China |
Heat treatment | Available |
Surface Work | TiCN, TiN, Aitain, Ticrn, nitriding , Black oxygened, Black coating etc available |
Tolerance | + - 0.002mm |
Polishness | Close to Ra0.2 |
Hardness | Depends on material(HRC60~94) |
Delivery time | 3-5 Working days, depends on the quantity the order. Express by DHL, UPS, FEDEX, TNT or Ocean Shipping etc. |
Main Products | Guide elements, punch pin, die button, ejector pin and sleeve, oilless bush, etc. |
Our Mainly Parts


Exhibition


Factory Equipment

OUR More Parts
Packing & Delivery

Certifications



Comprehensive score