0
image
image
long lead pilot punch

Pilot Punch similar DIN ISO 8020 Type C Long Lead Style Punches

ms mold parts
A long lead pilot punch is a precision tool with an extended guiding section, designed to ensure accurate alignment in progressive stamping dies. It smoothly enters pilot holes, reduces material shifting, and enhances punching precision for high-quality results.
Delivery
FOB
minimum order
1 piece
Supply Ability
10000.0piece / Month
Country of Origin
ShenZhen GuangZhou
Quantity:
USD0.10 - USD9.00 / piece
Contact Now
add to cart
  • Product Overview
    The Long Lead Pilot Punch is a specialized tooling component engineered for precise alignment and guiding in progressive stamping dies. Similar in function and quality to the Pilot Punch DIN ISO 8020 Type C, this punch features an extended guiding section to ensure smooth entry into pilot holes, minimize material shifting, and enhance punching accuracy in high-speed operations. Its robust design makes it ideal for demanding industrial applications where reliability and precision are critical.


    Key Features & Benefits

  • Extended Guidance Design
    The long lead section provides superior alignment, reducing deflection and ensuring accurate punching even in high-speed stamping processes.

  • Enhanced Durability
    Manufactured from high-grade tool steel and heat-treated for optimal hardness (60-62 HRC), this punch offers exceptional wear resistance and extended service life.

  • Smooth Pilot Hole Entry
    The tapered or rounded tip design allows for seamless entry into pilot holes, minimizing material drag and preventing damage to the workpiece or die components.

  • Compatibility with Standards
    Designed to perform similarly to the Pilot Punch DIN ISO 8020 Type C, ensuring interoperability with standardized die sets and ease of replacement.


  • Technical Specifications

  • Design: Long lead style with extended guiding section

  • Material: Premium tool steel (e.g., DIN 1.2379 or equivalent)

  • Hardness: 60–62 HRC

  • Surface Finish: Precision ground, Ra ≤ 0.4 μm

  • Compatibility: Suitable for progressive dies and precision stamping systems

Product Description
Specification
Material
Carbide,ASP23,Vanadis,CPMRTXM4,SKD11,SKD61,HSS,A2,M2,D2,SUJ2,S45C,ect
Standard
Dayton,Lane,DIN,ISO,MISUMI,EDM,FIBRO,MOELLER,HASCO,ect
Size
Depend on your drawings or products standard
Place of origin
Dongguan, Guangdong, China
Heat treatment
Available
Surface Work
TiCN, TiN, Aitain, Ticrn, nitriding , Black oxygened, Black coating etc available
Tolerance
+ - 0.002mm
Polishness
Close to Ra0.2
Hardness
Depends on material(HRC60~94)
Delivery time
3-5 Working days, depends on the quantity the order. Express by DHL, UPS, FEDEX, TNT or Ocean Shipping etc.
Main Products
Guide elements, punch pin, die button, ejector pin and sleeve, oilless bush, etc.
Our Mainly Parts
Exhibition
Factory Equipment
OUR More Parts
Packing & Delivery
Certifications